I managed to finish the handspun socks with little time to spare. They took longer to knit than I had expected. Here they are, posing with (the back of) the Gnomy Hat made of the same wool. Toasty warm and comfy!
And here they are, all steam blocked and ready to be labeled for the Chilliwack Christmas Craft Fair.
The labeling. Now there is another enterprise that took longer than I expected! Still, I was done before bedtime last night and everything is packed up ready to be inspected by the Standards Committee this morning.
1 comment:
You'll pass -- they're excellent!
Post a Comment