Translate

Showing posts with label Honeybee Stole. Show all posts
Showing posts with label Honeybee Stole. Show all posts

Saturday, October 20, 2007

Half Way

The first half of the Honeybee Stole is finished. I couldn't resist blocking it so I could really see what it looks like.



I'm very pleased with it. This is a symmetrical stole worked from the centre outward so, with the first half successfully completed, I anticipate no problems with the second half. Now I need to get busy and finish spinning that second package of Black Rainbow Glitter from Aurelia.


Here's a little close-up of a modification I am doing. I'm adding beads to the side and end edges. They are the "oil slick" colour, I think referred to as "dark aurora borealis", and they match the glitter in the handspun perfectly.



Also, instead of the "bind off loosely in knit" I'm using a great bind-off I learned when doing the Swallowtail Shawl. It makes for a very stretchy yet tidy edge.

K2, *transfer the 2 stitches on the right needle back to the left needle and then K2tog through the back loop. K1 and repeat from* around.

Wednesday, October 17, 2007

Bee and Honeycomb

I'm well into the bee and honeycomb section of the Honeybee Stole now.

Photo Sharing and Video Hosting at Photobucket

I'm hoping I'll have the time to completely finish this half of the stole before I have to put it down again. I'm allowing myself a few days working on it and then it's back to projects with looming deadlines again.

Monday, October 08, 2007

Through the Swarm

The second chart is done. I'm through the "swarm" section of the first half of the Honeybee Stole.

Here's a closer look at that (unblocked) section.


Sunday, September 30, 2007

Twinkle, Twinkle Little Toe

With the application of numerous sparkly little beads and sequins, the toe to Kaylen's Christmas stocking is now complete.

Photo Sharing and Video Hosting at Photobucket

Next step is several rather intricate snowflakes --- embroidered, beaded, sequined, backed, stuffed and dangling!

But not tonight. I haven't met my self imposed daily knitting deadline yet. I'm trying to stick to knitting 20 rows of the Honeybee Stole every day.

~

Saturday, September 29, 2007

100 rows

The first 100 rows are done.

Photo Sharing and Video Hosting at Photobucket

100 more to go --- in this section --- of this half of the Honeybee Stole.

Tuesday, September 25, 2007

First 28

With the MS3 ripped I've started reusing the handspun "Black Rainbow Glitter" on the Honeybee Stole. Once, twice, third time is the charm. I'm up to row 28 now.

Photo Sharing and Video Hosting at Photobucket

The red at the top (from this perspective) is just my provisional cast on. The green blips at the bottom are snippets of plastic straw I use for stitch markers. I'm adding beads to the edges of the stole, but they aren't visible in this photo.

Thanks Kaylen, for the use of your flannel "burp cloth". It makes a great lap cloth so that I can see the black stitches a little better. It works great when I'm spinning black too.