Two steps forward, one step back.
I had hoped to finish the argyle part of this sock some time tonight but I've had a set back. I could probably still reach that goal but I think I've had my fill of this thing for a while.
See the purple cord in the photos? That's the cord of my circular needle. I've run the needle through the stitches of a single row (at least I hope it's all in the same row), below the mistake I found.
I'm hoping that when I rip back the cable will catch the stitches and also help each section end on the same row. Trouble with ripping without a safety line in place cost me the entire argyle section the last time.
Anyway, this is the instep section. Even losing the portion I have to rip, I am nearing the end of the argyle knitting. Next step will be to sew in all the numerous ends and to duplicate stitch the lines. Then there is still the knitting of the sole and the toe.....but thankfully that will only be with the one colour.
2 comments:
that is a bummer, but the sock is lovely. :-)
That sounds complicated but it sure is pretty!
Post a Comment