
With this section pinned to exact size and blocking, I'll next be duplicate stitching the contrasting lines and then joining those two small sections still on stitch holders to start knitting the heel.
A fiber-crafts fanatic who lives to create. I'm also "Wovenflame" on Ravelry, Flickr, ETSY, DoA and yahoogroups.

See the purple cord in the photos? That's the cord of my circular needle. I've run the needle through the stitches of a single row (at least I hope it's all in the same row), below the mistake I found.
I'm hoping that when I rip back the cable will catch the stitches and also help each section end on the same row. Trouble with ripping without a safety line in place cost me the entire argyle section the last time.
The only progress I can report this week is reaching the half way point in the second row of diamonds. This is the dividing point where I put the side/heel stitches on holders and continue on, in pattern, down the arch of the foot. (Please ignore the messy bits at the joining points of the two tiers of diamonds. That will be cleaned up as I darn in the ends. No, really......I already checked that it works.)
The work is going much faster now that I have worked out this nifty system for handling the multiple bobbins and keeping them in order and untangled while I work. I have secured each bobbin to a peg in the raddle for my table loom. Once in place the top of the raddle snaps back on and the bobbins are able to move enough to unwind, but they are held in place and can't get out of order.
I worked up a bit of an argyle swatch this week in preparation for knitting the argyle sock for Level II. I think it turned out very well, although I see some areas I will need to work on.